Construction on the centipede is back in progress.
Power harness is 90% done.
Signal loom is strung.
Board connectors 33% done.
Chassis DONE
Motors INSTALLED
Whegs INSTALLED
see http://www.bio-bot.com/movies
All the news that's fit to assimilate
[ Home | Blogs | Events | Robots | Humans | Projects | Podcasts | About | Account ]Construction on the centipede is back in progress.
Power harness is 90% done.
Signal loom is strung.
Board connectors 33% done.
Chassis DONE
Motors INSTALLED
Whegs INSTALLED
see http://www.bio-bot.com/movies
Follow us on twitter
Become a fan on facebook
Subcribe to our RSS feed
2011 Top 10 Robot Christmas Gift Ideas
Review: Apocalyptic AI by Robert M. Geraci
Raspberry Pi Interview with Eben Upton
Review: Robotics Programming 101
2011 VEX Robotics World Championship
Giant Dallas Robot Cited as Best Public Art
There's More Than One Way to Skin a Robot
Polulu 3pi: the 10,000 Mile Review
Day of the Androids at Hanson Robotics
Machinima Review: Stolen Life