| [ Home | Events | Robots | Humans | Projects | About | Account ] | |
9 Aug 2005 jcrobotics »
Today I changed the distribution of the boards of the
Golias HBridges. When I prepared the wiring I came the new
idea of where they would have to be fixed and this saved
much space and electric wire. The wiring was stops after
fixing the boards again.
|