| The aim of this project was to design and build a mouse that is capable of traversing the maze satisfactorily in a given time. The mouse was to comply with module requirements and conform IEE requirements.
The project was divided into two main parts, which are the software part and the hardware part. The hardware is further divided into smaller sections. Each section is dedicated to a particular function or a component in the project. These include the chassis, motors, sensors, design of the unit, Placement of components and ergonomics etc. Software has two main parts to it the planing stage and the programming. Planing includes the flow charts and algorithms of different functions. |